I visited the Greenway a few days ago and saw lots going on, as the temporary Greenway takes shape, giving hints about the future, and the abandoned railroad track becomes a memory.

As usual, click a photo to enlarge it.

At Burrard & Greenway, a traffic signal is now in place.  Greenway travelers get a signal pole on both east and west sides, each with a crossing button.  Note the new crosswalk on Burrard and painted lane dividers on the asphalt part of the Greenway.

Arbutus.Greenway.Burrard

At several places, a centreline divider is visible, with what appears to be potting soil awaiting plants.

Arbutus.Planting.2

Likewise, crews were spreading soil on the edges of the temporary pathway.  One person on the crew told me that the plan is to plant wild flowers there.  I like it.

Arbutus.Planting