The last phase of the Point Grey Road Seaside Greenway work is well underway.  Wider sidewalks, with further spacing from the road, and city-owned land for them reclaimed from residents’ encroachment.

Note the level sidewalks, with no driveway dips — making runner, ped and wheelchair travel much easier.

PGR.2.March.14.2017.2

Wider, level, with more separation to road.

PGR.2

PGR.2.March.14.2017

Encroachment retrieval